Engineered High Performance Surfaces & Flooring

Accelerated Schedule

Some projects that have little or no down-time available can take advantage of specialty systems that can be installed on an accelerated time schedule. This is achieved through the use of specialized products and accelerators that decrease curing time.

Situations where typically used

  • Emergency repairs & restoration
  • Overrun schedules
  • Holiday closings
  • Maintenance shutdowns
  • Cool weather installs

Contact an Elite Crete Systems technical representative for more details.

Case Studies

Translate »